Assure

ASSESS

C2 Assurance

Build the evidence behind your C2 operation.

Flyvercity helps professional UAS operators and integrators turn an intended operation, its C2 architecture and the applicable compliance path into measurable claims and traceable engineering evidence.

END-TO-END C2 CHAIN

Aircraft
Communication
service
Ground
system

The real buyer problem

You may know the rule. The hard part is proving the chain.

Operators frequently arrive with a SORA result, an upcoming authorisation milestone or a request to address OSO #6—but no practical evidence architecture.

Flyvercity connects the compliance objective to the complete technical chain: aircraft equipment, external communication service, ground system, procedures and representative operating conditions.

Means of Compliance are the reference point.The deliverable is operation-specific, measured and traceable evidence.

Who it is for

Built around real operational decisions.

01

UAS OPERATORS

Preparing new BVLOS operations, expanding operating areas or changing communication architecture.

02

SYSTEM INTEGRATORS

Responsible for demonstrating the performance of the complete UAS system.

03

UAS OEMs

Building reusable evidence approaches across customer deployments.

04

SAFETY & PROGRAMME TEAMS

Preparing technical material for safety reviews, customer acceptance or regulatory interaction.

The strongest fit is an organisation with a defined operation and a real deployment or authorisation milestone.

Engineering process

From operation to evidence.

01ConOps
02Requirements
03Testing
04Assessment
05Evidence
01

UNDERSTAND

Review the Concept of Operations, aircraft, communication architecture, operating environment, external services and existing evidence.

02

DEFINE

Identify relevant C2 performance claims, required evidence, operational thresholds and degraded conditions.

03

TEST

Design representative measurement across the complete communication chain.

04

ASSESS

Analyse performance, margins, exceptions, degraded states and operational limitations.

05

EVIDENCE

Document method, provenance, assumptions, results, exceptions and unresolved risks.

Compliance references

A defensible route from SORA objective to Means of Compliance.

Flyvercity starts with the applicable authorisation and design context, then identifies which published material is relevant to the specific C2 architecture.

For medium-risk Light-UAS work, EUROCAE ED-325 Vol. I presents proposed MoC material for selected SAIL III/IV requirements. EASA’s proposed MoC to OSO #6 adds focused C2-link guidance, including representative testing.

Assessment scope

Operation-specific performance.

Assessment areas are selected for the actual operation and communication architecture—not applied as a generic checklist.

01Latency02Availability03Continuity04Packet loss05Service area06Degradation07Handover behaviour08Lost-link conditions09Geographical variation10Pre-flight checks

Market + compliance trajectory

From coverage confidence to continuous C2 assurance.

This is an operating maturity path, not a forecast of regulatory dates. Organisations may enter at different points depending on their SAIL, design path, external services and authority expectations.

EVOLUTION
TODAYBASELINE
OPERATION-SPECIFICPERFORMANCE
HIGHER ASSURANCEEVIDENCE
AT SCALECONTINUOUS
MARKET
01

Coverage maps, supplier SLAs and successful flights are used as broad proxies for C2 suitability.

02

Operators define the communication performance actually needed for a route, aircraft and operating environment.

03

Procurement and deployment decisions increasingly require repeatable evidence—not vendor coverage assertions alone.

04

Changing routes, networks and fleet configurations make one-off evidence progressively less useful.

COMPLIANCE
01

The operation establishes its authorisation basis, SORA result and relevant C2 safety objectives.

02

Map claims to applicable AMC/GM, OSO #6 guidance, external-service objectives and required C2 link performance.

03

Select a defensible MoC path; use relevant EUROCAE ED-325 guidance and representative end-to-end tests where applicable.

04

Maintain assumptions, configuration and change impact as the approved operation and supporting services evolve.

FLYVERCITY
01

Readiness Scan: define the C2 chain, decision boundary, existing evidence and gaps.

02

Claim Map: turn the ConOps and architecture into measurable thresholds and degraded conditions.

03

Test + Evidence: design representative measurement, analyse margins and build traceable documentation.

04

Operational assurance: route checks, service-volume analysis, degradation detection and periodic evidence updates.

START HERE

ASSESS

C2 Evidence Readiness Scan

Before commissioning another test campaign, establish what actually needs to be demonstrated.

  • Operation and C2 architecture
  • Intended approval or deployment path
  • Existing measurements and documentation
  • Evidence gaps

OUTPUTS

01

CLAIM MAP

What needs to be demonstrated.

02

EVIDENCE GAP REGISTER

What is already supported and what remains missing.

03

PRELIMINARY TEST PLAN

What should be measured and under which representative conditions.

04

NEXT-STEP RECOMMENDATION

Whether further testing is justified and what it should achieve.

Request an Evidence Readiness Scan

Start with the operation

Does your operation depend on external C2 connectivity?

Show us the intended operation, communication architecture and current evidence. We will start with what actually needs to be demonstrated.

Discuss your C2 operation